1) AGC Glass Flat s.r.o., Kryry
Implementation: 2013 – 2014
Reconstruction of the neutralization station for wastewater from the mirror line with recycling of rinse water.
2) MTC Comax Trade, Velvary
Implementation: 2014 – 2015
1.5 m³/hr demi-flood circuit on the painting line.
3) Galvanovna JESVA, Hořice
Implementation: 2014 – 2015
6 m³/hr ion exchange treatment for neutralization of electroplating plant wastewater, reconstruction and extension of the plant with Zinc Nickel branch, ATOTECH acid bath, fully automatic curtain and drum system.
4) ASSA ABLOY a.s., Rychnov nad Kněžnou
Implementation: 2013 – 2014
Reconstruction of the neutralization station for wastewater from the electroplating plant, demi-water production line with partial recycling, and extension of the electroplating line.
5) Ionex line, Africa/Mongolia
Implementation: 2010 – 2013
Pre-treatment for mobile reverse seawater desalination plant.

6) TOKOZ a.s., Žďár nad Sázavou
Implementation: 2012
End line for ion exchange treatment of wastewater from neutralization station, 15 m³/hr.

7) PROMAT s.r.o., Chlumec nad Cidlinou
Implementation: 2014
Disposal of waste water from fire glass cutting, 1.5 m³/hr.
8) Pramet Šumperk s.r.o., Šumperk
Implementation: 2012 – 2015
Neutralization station of wastewater from the hardmetal coating line, closed liquor circuit, scrubber, ultrafiltration unit.

9) ZVVN Milevsko s.r.o., Planá nad Lužnicí
Implementation: 2014
Reconstruction of desulphurisation, limestone slurry preparation unit.

10) MVS Metal Studénka s.r.o., Studénka
Implementation: 2014 – 2015
Bumper painting line, pre-treatment line.

11) Speciální povrchové úpravy s.r.o., Ostrava
Implementation: 2013
Complete reconstruction of neutralization station, ion exchange purification line, dialysis unit for nickel bath maintenance.

12) MS Technik s.r.o., Rožnov pod Radhoštěm
Implementation: 2016 – 2017
Complete supply of an automatic line for recycling wastewater from the surface treatment line.
13) KRAUS MAFEI Slovakia
Implementation: 2018
Delivery of a degreasing box in the wet paint shop, including preparation of demineralisation and passivation baths.
14) AGC Glass s.r.o., Teplice, Oloví, Kryry, Nižnij Novgorod
Implementation: 2014 – 2020
Supply of frosting lines for glass, including wastewater disposal stations from frosting and cutting processes - implemented 5 times at different locations.
15) IFE s.r.o., Brno - Modřice
Implementation: 2015 – 2019
Complete delivery of automatic chemical pre-treatment line for painting line, neutralization station and demiwater production, including increase of line output.
. 
16) Speciální povrchové úpravy s.r.o., Ostrava
Implementation: 2018 – 2020
Complete delivery of automatic surface treatment line.
.

17) Federal Mogul s.r.o., Dačice
Implementation: 2020 – 2021
Complete supply of automatic ultrafiltration unit and neutralization station.

18) SSI Schaefer s.r.o., Hranice na Moravě
Implementation: 2017 – 2019
Complete supply of automatic painting line, high-pressure degreasing boxes, burning box, closed degreasing circuit and neutralization station.
. 

19) Excalibur Army s.r.o., Přelouč, Kopřivnice
Implementation: 2019 – 2021
Complete reconstruction of the deemulsification station in TATRA Kopřivnice and VOP Přelouč.
. 
20) Dormet Pramet s.r.o., Šumperk
Implementation: 2019 – 2021
Complete reconstruction of the neutralization station.
. 
21) IFE Modřice
Implementation: 2021 – 2022
Installation of automatic sludge plug to increase neutralization station performance.

22) GUTRA s.r.o., Most
Implementation: 2020 – 2021
Construction of an automatic deemulsification and neutralization station for hazardous waste disposal.
. 
23) METALDYNE s.r.o., Oslavany
Implementation: 2020 – 2023
Construction of an automatic neutralization station for wastewater from surface treatment line.
.

24) ON Semiconductor s.r.o., Rožnov pod Radhoštěm
Implementation: 2021
Installation of automatic scrubber on HCL stack.

25) MS Technik s.r.o., Rožnov pod Radhoštěm
Implementation: 2020
Automatic borehole water treatment plant.

26) Denas Děčín s.r.o., Jílové u Děčína
Implementation: 2021
Construction of automatic neutralization station with ceramic ultrafiltration unit for degreasing bath regeneration.
. 
27) OTK Kolín a.s., Kolín
Implementation: 2022
Delivery of automatic chrome water disposal and neutralization station.

28) Tilapia s.r.o., Nuzbely u Tábora
Implementation: 2022
Construction of automatic closed water circuit in intensive fish farming.

29) Canna a.s., Praha
Implementation: 2022 – 2023
Production and development of automatic extractor for plant substance extraction for medical use.
. 

30) TSC Jet a.s., Ostrava
Implementation: 2022 – 2024
Production and development of automatic neutralization plant with wastewater recycling.
.
. 
31) MS Technik s.r.o., Nový Jičín
Implementation: 2022 – 2025
Design and manufacture of complete suspended galvanizing line including air handling and neutralization station. Installation and start-up of the complete galvanic line.