References + Gallery

1) AGC Glass Flat s.r.o., Kryry

Implementation: 2013 – 2014

ref1a ref1b

P4100439 P4100434

Reconstruction of the neutralization station for wastewater from the mirror line with recycling of rinse water.

2) MTC Comax Trade, Velvary

Implementation: 2014 – 2015

1.5 m³/hr demi-flood circuit on the painting line.

3) Galvanovna JESVA, Hořice

Implementation: 2014 – 2015

6 m³/hr ion exchange treatment for neutralization of electroplating plant wastewater, reconstruction and extension of the plant with Zinc Nickel branch, ATOTECH acid bath, fully automatic curtain and drum system.

 

4) ASSA ABLOY a.s., Rychnov nad Kněžnou

Implementation: 2013 – 2014

Reconstruction of the neutralization station for wastewater from the electroplating plant, demi-water production line with partial recycling, and extension of the electroplating line.

ref4a   

5) Ionex line, Africa/Mongolia

Implementation: 2010 – 2013

Pre-treatment for mobile reverse seawater desalination plant.

ref5a    ref5b

 

6) TOKOZ a.s., Žďár nad Sázavou

Implementation: 2012

End line for ion exchange treatment of wastewater from neutralization station, 15 m³/hr.

ref6

7) PROMAT s.r.o., Chlumec nad Cidlinou

Implementation: 2014

Disposal of waste water from fire glass cutting, 1.5 m³/hr.

 

8) Pramet Šumperk s.r.o., Šumperk

Implementation: 2012 – 2015

Neutralization station of wastewater from the hardmetal coating line, closed liquor circuit, scrubber, ultrafiltration unit.

ref8

9) ZVVN Milevsko s.r.o., Planá nad Lužnicí

Implementation: 2014

Reconstruction of desulphurisation, limestone slurry preparation unit.

ref9   ref9b

10) MVS Metal Studénka s.r.o., Studénka

Implementation: 2014 – 2015

Bumper painting line, pre-treatment line.

ref10

11) Speciální povrchové úpravy s.r.o., Ostrava

Implementation: 2013

Complete reconstruction of neutralization station, ion exchange purification line, dialysis unit for nickel bath maintenance.

ref11   ref11b

12) MS Technik s.r.o., Rožnov pod Radhoštěm

Implementation: 2016 – 2017

Complete supply of an automatic line for recycling wastewater from the surface treatment line.

 

13) KRAUS MAFEI Slovakia

Implementation: 2018

Delivery of a degreasing box in the wet paint shop, including preparation of demineralisation and passivation baths.

 

14) AGC Glass s.r.o., Teplice, Oloví, Kryry, Nižnij Novgorod

Implementation: 2014 – 2020

Supply of frosting lines for glass, including wastewater disposal stations from frosting and cutting processes - implemented 5 times at different locations.

15) IFE s.r.o., Brno - Modřice

Implementation: 2015 – 2019

Complete delivery of automatic chemical pre-treatment line for painting line, neutralization station and demiwater production, including increase of line output.

ref12a.  ref12b

16) Speciální povrchové úpravy s.r.o., Ostrava

Implementation: 2018 – 2020

Complete delivery of automatic surface treatment line.

Obrázek2.  Obrázek1   Obrázek3

17) Federal Mogul s.r.o., Dačice

Implementation: 2020 – 2021

Complete supply of automatic ultrafiltration unit and neutralization station.

Obrázek4

18) SSI Schaefer s.r.o., Hranice na Moravě

Implementation: 2017 – 2019

Complete supply of automatic painting line, high-pressure degreasing boxes, burning box, closed degreasing circuit and neutralization station.

Obrázek5   Obrázek6.  Obrázek7

Obrázek8

19) Excalibur Army s.r.o., Přelouč, Kopřivnice

Implementation: 2019 – 2021

Complete reconstruction of the deemulsification station in TATRA Kopřivnice and VOP Přelouč.

Obrázek9.  Obrázek10

20) Dormet Pramet s.r.o., Šumperk

Implementation: 2019 – 2021

Complete reconstruction of the neutralization station.

Obrázek11.  Obrázek12

21) IFE Modřice

Implementation: 2021 – 2022

Installation of automatic sludge plug to increase neutralization station performance.

Obrázek13

22) GUTRA s.r.o., Most

Implementation: 2020 – 2021

Construction of an automatic deemulsification and neutralization station for hazardous waste disposal.

Obrázek14.  Obrázek15

23) METALDYNE s.r.o., Oslavany

Implementation: 2020 – 2023

Construction of an automatic neutralization station for wastewater from surface treatment line.

Obrázek16.  Obrázek17   Obrázek18

24) ON Semiconductor s.r.o., Rožnov pod Radhoštěm

Implementation: 2021

Installation of automatic scrubber on HCL stack.

Obrázek19

25) MS Technik s.r.o., Rožnov pod Radhoštěm

Implementation: 2020

Automatic borehole water treatment plant.

Obrázek20

26) Denas Děčín s.r.o., Jílové u Děčína

Implementation: 2021

Construction of automatic neutralization station with ceramic ultrafiltration unit for degreasing bath regeneration.

Obrázek21.  Obrázek22

27) OTK Kolín a.s., Kolín

Implementation: 2022

Delivery of automatic chrome water disposal and neutralization station.

Obrázek23

28) Tilapia s.r.o., Nuzbely u Tábora

Implementation: 2022

Construction of automatic closed water circuit in intensive fish farming.

Obrázek24

29) Canna a.s., Praha

Implementation: 2022 – 2023

Production and development of automatic extractor for plant substance extraction for medical use.

Obrázek25   Obrázek26.  Obrázek27

Obrázek28

30) TSC Jet a.s., Ostrava

Implementation: 2022 – 2024

Production and development of automatic neutralization plant with wastewater recycling.

TSC JET_2024.  TSC JET_2024_01.  TSC JET_2024_02

 

31) MS Technik s.r.o., Nový Jičín

Implementation: 2022 – 2025

Design and manufacture of complete suspended galvanizing line including air handling and neutralization station. Installation and start-up of the complete galvanic line.

THIS WEBSITE USES COOKIES
By clicking „Accept All“, you consent to their storage on your device, which helps with site navigation, data usage analysis, and our marketing efforts.
Find out more
  1. They are necessary for the site to work, so it is not possible to turn them off. They are usually set up in response to actions you have taken, such as requesting services related to security settings, logging in, filling out forms, and so on. You can set your browser to block cookies or send notifications about them. Keep in mind that some pages without these files will not work. These cookies do not store any personally identifiable information.
  2. They help track the number of visitors and also the source of the traffic, which allows us to improve the performance of the site. With them, we can determine which sites are the most popular and which are not popular, and we can also track how visitors navigate the site. All information that cookies collect is aggregated and anonymous. If you do not enable cookies, we will not know when you visited our site.
  3. These cookies can be set on our site by advertising partners. They can use them to profile your interests and show you ads on other sites. However, they do not store your personal information directly, but through the unique identifiers of the browser and Internet device. If you don't enable them, you'll see less targeted promotion on your site.

You can change or revoke your consent at any time by clicking on the Cookies link in the footer of the website.